在机组初次投入使用,运行于工作状态之后(或实际运行3-4小时),应再次停机检查两联轴器同轴度是否发生变化,如有变动可仍然按上述机组的安装与检查中的规定来调节联轴器同轴度,直到符合要求且泵轴能用手轻松盘动时即可。
In the unit for the first time to use, running in the operating state (or the actual operation 3-4 hours), should be stopped to check the coaxial degree of the two couplings are changed, if there is a change in the installation and inspection of the unit can still be adjusted according to the provisions of the shaft coupling, until the pump shaft can be easily operated with a light.
常州市武研热油泵有限公司
地 址:常州市武进区横林镇横玉路247号
销 售:0519-89197180,0519-89197280
售 后:0519-89197580
传 真:0519-89197380
手 机:13775024666
Q Q: 876363125
邮 箱:WRY@vip.163.com
导热油泵:www.wry006.com
WRY热油泵:www.wry002.com
WRY导热油泵:www.wry008.com
离心式热油泵:www.wry003.com
友情链接:武研热油泵 www.wyryb.com
锅炉辅机:www.whboiler.com
刮板出渣机:www.cz-boiler.net
主动/被动炉排片:www.glfj.net
提升式上煤机:www.wh-boiler.com
武研导热油泵:http://wrypump.cn.alibaba.com
锅炉辅机配件:http://glboiler.cn.alibaba.com
2015.9.9.小彭